Project Royal Brisbane Hospital Block 7
Duration April to December 2004
Man-hours 10,000
Manning Peak 12
Contract Value $1,000,000
Description
Supply, installation, testing and commissioning of a Structured Cabling System at RBH Block 7 on Levels 1 to 14. The Structured Cabling System is suitable for voice, data, text, graphics and video signal communications, using multi vendor, multi product computer systems.
A system of interfloor and intrafloor cabling also links adjacent Floor Distributors to provide additional levels of flexibility and reliability. As this is a medical facility the requirement of PC1 and PC2 areas was needed. Therefore the air sealing of a number of areas was required.
Awards:
NECA 2005 Excellence Award for:
Voice / Data Large Project